Client Mr & Mrs Goldman
Project The construction of 3 purpose built homes
We carried out the demolition of the existing bungalow and carried out the construction of 3 new build 3 bedroom houses on the existing plot.
The homes were to a very high specification using sustainable and recycled materials in line with our Environmental policy.
The works were completed in a time frame of 16 weeks and came complete with our 10 year NHBC guarantee.
Extension
Complete refurbishment and large extension.
- Three bedrooms.
- Two en-suite shower rooms.
- A large family bathroom.
- Kitchen.
- Lounge and dining room.
- Complete with a new tiled roof.
Drainage
Client JT Builders
Project Durley Avenue
Upon inspection all the existing drains had callapsed and had the incorrect falls. Hi-Tech Property Services carried out a CCTV survey and produced a written report with Cad drawings and DVD explaining the problem in detail.
To remedy the problem a new drainage system was installed after excavation and removal of the existing.
The system is now fully operational and the works were completed in 2 weeks from commencement to completion.
Drainage repairs to car park
The problem
Southern processing Ltd contacted Hi-Tech Property Services Ltd and requested a site visit regarding a continual problem with poor yard drainage and concrete damage that required repairs at their site in Southampton Hampshire
The solution
Hi-Tech Property Services Ltd attended the site and made recommendations to cut out and remove all the damaged concrete areas, remove and replace defective drainage with new yard gullies connected to an oil interception drain. Fibre reinforced concrete was used to repair the damaged areas of the yard. All areas were protected...
NHS offices
Client Local NHS offices
Our client had poor access for disabled employees and visitors, this arrangement with different levels, ramps and hoists was installed to the latest building regulations and has given all users a cost effective solution to a very common problem.
Private Dwelling
We recently carried out renovation to this 150 year old building, which was experiencing extensive water ingress.
The work included full renovation of the external window frames, facias and French windows.
The roof ridge and hips also required full restoration, as did the chimney stacks, necessitating the erection of scaffolding.
All leaks have now been rectified and the client has piece of mind that all works come complete with a 15 Year Insurance backed gaurentee.
Local Authority School
Client City Council
Project Local Authority School
We were successful with winning the competitive tender for the replacement of the slate roof to this particular school.
Extensive water ingress was occurring resulting in disruption to classes during term times.
A very tight time frame was given to completely strip off the existing roof, replace defective joists, battens, felt and broken tiles and replace with new.
The works were carried out within the time frame of 4 weeks and within budget to the complete...